Going solar is simpler than most Calgary homeowners expect. With a full-service installer, you make a few decisions and the team handles the rest. Here’s exactly what happens, step by step.
Step 1: Free quote
You share your address and a recent power bill, or your last 12 months of usage. The installer uses satellite imagery and your usage to suggest a system size and an estimated price. At Nova, the request takes about 30 seconds and we call back within one business day.
Learn more: read Solar Installation in Edmonton: From Quote to Switch-On.
Step 2: Site assessment
A technician checks your roof’s condition, pitch, direction and shading, plus your electrical panel. Some older Calgary homes need a panel upgrade, and this is where it’s caught.
Related reading: Solar Panels in Calgary: The Complete 2027 Homeowner Guide
Step 3: Custom design
Your system is designed around your yearly usage and Alberta’s micro-generation rules. You’ll see:
- Panel layout on your roof
- Expected yearly production
- Equipment models and warranties
- Final price and financing options
Read next: Calgary Solar Quote Checklist: Comparing Prices Line by Line
Step 4: Permits and utility approval
Your installer applies for the required permits and the utility interconnection approval. This is usually the longest wait in the process, and you don’t have to do any of the paperwork.
Want the details? See Solar Permits in Calgary: What the Process Looks Like.
Step 5: Installation day
Most Nova installs are completed in a single day. The crew mounts racking, installs panels, runs wiring and connects the inverter. Expect some noise on the roof and a short planned power interruption while the system is tied in.
Step 6: Inspection and switch-on
Once inspections are complete and the utility approves, your system is switched on. You start producing your own power right away.
Step 7: Monitoring and Solar Club
From day one, your monitoring app shows what your panels produce and export. Nova customers are enrolled in the Solar Club automatically, selling surplus at 35¢/kWh in spring and summer and buying at 5.9¢/kWh in fall and winter.
How long does it take?
Timelines vary with the season and permit volumes. Your installer should give you an estimated timeline at the design stage, and keep you updated.
Ready to start step one?